METODE FULL TIME EQUIVALENT UNTUK PENGUKURAN BEBAN KERJA MEKANIK DIVISI WORKSHOP DI PABRIK KERNEL OIL

Rizki Alfi, Aziza Azzahra, Fikri Arsil

Abstract

Activities in carrying out work often make workers feel tired, especially work that requires continuity, skill and concentration. Work activities like this can be quite burdensome for mechanics, which can cause fatigue or injury to workers. On the other hand, a workload that is too light can cause workers to become bored or bored with their work. The aim of this research is to determine the workload in each division area studied, and to estimate the right number of workers for a particular position so that it can be a recommendation for companies regarding workload. The Full Time Equivalent (FTE) method is a method for measuring workload by measuring the length of time needed to complete a given task. After carrying out the calculations, the FTE index values are obtained as follows; 1) The press station mechanic is in the 4.39 category (overload), indicating that 2 more employees are needed. 2) General installation mechanics of 0.34 category (underload). This indicates that there is no need for additional employees, but perhaps a reduction in employees to 1 person. 3) Workshop mechanics amounted to 3.63 in the category (overload). This indicates that 2 more mechanics are needed. 4) Mechanical electrical installation is 0.45. This indicates that there is no need for additional mechanics in this area. By calculating the FTE method, it can be seen that there are 2 divisions that fall into the overload workload category, and 2 divisions that fall into the underload workload category. The results of this research are quantitative and from a macro perspective, so it is necessary to also consider socio-cultural factors with employment regulations.

Keywords

Full Time Equivalen, Mechanical Workload, Overload, Underload

Full Text:

PDF

References

Adawiyah, Wildanur; Sukmawati, A. (2013). Analisis Beban Kerja Sumber Daya Manusia dalam Aktivitas Produksi Komoditi Sayuran Selada ( Studi Kasus : CV Spirit Wira Utama ). Jurnal Manajemen Dan Organisasi, IV(2), 128–143.

Albana, W. (2022). Analisis Beban Kerja kKryawan dengan Meggunakan Metde Full Time Equivalent di PKS PTPN IV Unit Solok Sinumbah. Universitas Medan Area.

Anwar, S., Mutiara, D., Studi, P., Industri, M., Studi, P., Produksi, S., Pasang, J. B., & Barat, S. (2015). Beban Kerja Mental menurut Level Jabatan dan Usia Karyawan di IndustriCPO. Seminar Nasional Teknologi Informasi, Komunikasi Dan Industri (SNTIKI) 7, November, 328–334.

Bakri, Solichul HA;Tarwaka;Sudiajeng, L. (2004). Ergonomi: Untuk Keselamatan, Kesehatan Kerja dan Produktifitas (1st ed.). Uniba Press.

Cahyati, A. Y., & Setyawan, W. (2021). Analisis Optimalisasi Kebutuhan Karyawan Berdasarkan Beban Kerja dengan Metode Full Time Equivalent ( Studi kasus : Fakultas Teknik UNSUR ). 1–11.

Dewi dan Satrya. (2012). Analisis Kebutuhan Tenaga Kerja Berdasarkan Beban Kerja Karyawan Pada PT PLN (Persero) Distribusi Jakarta Raya dan Tangerang Bidang Sumber Daya Manusia dan Organisasi. Http://Www.Aisi.or.Id/Statistic/; Jurusan Manajemen SDM Fakultas Ekonomi Universitas Indonesia, Depok. http://www.aisi.or.id/statistic/

Kabul, E. R., & Febrianto, M. N. (2022). Implementasi Metode Full Time Equivalent ( FTE ) Dalam Analisis Kebutuhan Tenaga Kerja. IKRAITH-EKONOMIKA, 5(1), 162–168.

Kurniawan, H., & Shaura, R. K. (2023). Enrichment : Journal of Management Workload Analysis Using the Full Time Equivalent ( FTE ) Method to Optimizing Labor. Enrichment: Journal of Management, 12(4), 3058–3066.

Nurul Hudaningsih, R. P. (2019). Analisis Kebutuhan Karyawan dengan Menggunakan Metode Full time Equivalent (FTE) pada Departemen Produksi PT. Borsya Cipta Communica. JURNAL TAMBORA, 3(2), 98–106. http://jurnal.uts.ac.id

Puspitasari, I. (2019). Siapkan Modal Rp 200 Miliar, Mahkota Group Bangun Pabrik Penyulingan di Dumai. Kontan.co.id. https://insight.kontan.co.id/news/siapkan-modal-rp-200-miliar-mahkota-group-bangun-pabrik-penyulingan-di-dumai

Putri Merlie, P. (2021). Pengukuran beban kerja dengan metode full time equivalent dan penentuan jumlah tenaga kerja efektif menggunakan workload analysis. JIEOM, 04(01), 5–9.

Wibawa, R. P. N., Sugiono, S., & Efranto, R. Y. (2014). Analisis Beban Kerja Dengan Metode Workload Analysis Sebagai Pertimbangan Pemberian Insentif Pekerja (Studi Kasus Di Bidang Ppip PT Barata Indonesia (Persero) Gresik). Jurnal Rekayasa Dan Manajemen Sistem Industri, 2(3).

Refbacks

  • There are currently no refbacks.