ANALISIS EFEKTIVITAS MESIN SCREW PRESS MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS PABRIK KELAPA SAWIT SOLOK SELATAN

Afif Ahmad Syukra, Gustiarini Rika Putri

Abstract

One of the industries in South Solok is a manufacturing company engaged in the Palm Oil Processing (PKS) industry. In order to maintain the quality and excellence of its products, this company must carry out more maintenance and monitoring of the smoothness of its production process. One of the more maintenance that must be carried out in this industry is maintenance of the screw press machine which often experiences obstacles during production, if a problem occurs with this machine, the processing process at the next station will be disrupted and can even stop operating. After conducting interviews with field supervisors, it can be concluded that screw press machines often experience problems such as stopping while operating due to less than optimal maintenance, and the age of the machine is old.

Keywords

Machine Effectiveness, Overall Equipment Effectiveness

Full Text:

PDF

References

Amelia, P., & Lubis, R. F. (2022). ANALISIS EFEKTIVITAS KINERJA RIPPLE MILL MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS : STUDI DI PALM OIL INDUSTRY SUMATERA UTARA. SAINTI: Majalah Ilmiah Teknologi Industri, 19(1), 1–8. https://doi.org/dx.doi.org/10.52759/sainti.v19i1.288

Dwijaputra, A., Nurasanti, E., & Priyasmanu, T. (2022). Perencanaan Jadwal pemeliharaan mesin Cane Carrier Dan IMC Dengan Menggunakan Metode Reability Centered Maintenance II (RCM II) Pada PG Kebon Agung. Jurnal Valtech (Jurnal Mahasiswa Teknik Industri), 5(1), 1–10.

Fajrah, N., & Noviardi, N. (2018). Analisis Performansi Mesin Pre-Turning dengan Metode Overall Equipment Effectiveness pada PT APCB. Jurnal Optimasi Sistem Industri, 17(2), 126–134. https://doi.org/10.25077/josi.v17.n2.p126-134.2018

Kurniawan, Fajar. (2013). Manajemen Perawatan Industri :Implementasi Total Productive Maintenance (TPM), Preventive Maintenance & Reliability Centered Maintenance (RCM). Yogyakarta: Graha Ilmu

Muhsin, A. (2016). Analisis Performansi Departemen Machinning Menggunakan Metode Overall Equipment Effectivenes (Oee). Jurnal OPSI (Optimasi Sistem Industri), 9(1), 16–23.

Pratama, L. D. (2018). ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES SEBAGAI REKOMENDASI PERBAIKAN MAINTENANCE (STUDI KASUS: CV. ARSILA BAKERY). Universitas Islam Indonesia.

Rahayu, A. (2014). Evaluasi Efektivitas Mesin Kiln Dengan Penerapan Total Productive Maintenance Pada Pabrik II/III PT Semen Padang. Jurnal Optimasi Sistem Industri, 13(1), 454–485.

Viarani, S. O., Lubis, R. F., Jumita, S., & Siregar, R. S. (2022). Analysis of Crude Palm Oil Quality Using Statistical Quality Control in the Palm Oil Industry. JASc (Journal of Agribusiness Sciences), 05(02), 84–97. https://doi.org/10.30596/jasc.v6i2.10116

Refbacks

  • There are currently no refbacks.